Powered By Kitlog Pro v2.0
Bobby's RV-10 Build
RV-10
Horiz. Stabilizer
1-13-2018
< Previous Log Entry
Next Log Entry >
Date:
1-13-2018
Number of Hours:
3.00
Manual Reference:
Brief Description:
HS Assembly (again)
Reassembling the HS again, not for the last time. Fluting some parts to keep them straight. Making stands to hold the assembly while working with the skins.
Fluting
Woodworking!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
60
118
Avionics
1
Elevator
6
9
Empennage
5
5
Horiz. Stabilizer
16
42
Miscellaneous
3
Priming Interior
5
13
Rudder
10
27
Shop
3
Tools
3
Vertical Stabilizer
8
22
Copyright © 2001-2024 Matronics. All Rights Reserved.