Powered By Kitlog Pro v2.0
Bobby's RV-10 Build
RV-10
All
10-9-2019
< Previous Log Entry
Next Log Entry >
Date:
10-9-2019
Number of Hours:
1.00
Manual Reference:
Brief Description:
Elevator tip/counterbalance drilling
These were the first parts in the kit where the holes had some shadowing. Emailed Van's and they said it was normal and to drill them out.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
60
118
Avionics
1
Elevator
6
9
Empennage
5
5
Horiz. Stabilizer
16
42
Miscellaneous
3
Priming Interior
5
13
Rudder
10
27
Shop
3
Tools
3
Vertical Stabilizer
8
22
Copyright © 2001-2024 Matronics. All Rights Reserved.