Powered By Kitlog Pro v2.0
Freds Web Site
CH 601 XL
Fuselage
2-2-2009
< Previous Log Entry
Next Log Entry >
Date:
2-2-2009
Number of Hours:
8.00
Manual Reference:
Brief Description:
Aft Wire Run & Glove Box
Constructed the aft cover for the wire run that will follow done from the center console, through the lower center console, under the arn rest, up over the baggage area front panel, to all electrical needs in the aft end of the A/C.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH 601 XL Home
Category
# Logs
# Hours
All
74
814
601XL Upgrade
12
156
Avionics
1
4
Electrical
19
334
Empennage
8
83
Engine
1
10
Expense Receipts
1
1
Fuselage
13
92
Interior
1
12
Miscellaneous
1
4
Wings
17
118
Copyright © 2001-2024 Matronics. All Rights Reserved.