Brief Description: Riveted L & R Elevator Skeltons
Finished riveting right and left elevator skeletons according to plans. Applied GE Aluminum RTV to both skins at trailing edge stiffeners. This material worked great as it was quite firm and stayed in place. I ran a ~1.4" cord down the trailing edges first to ensure that they remained open for water drainage. After the RTV started to set up, I pulled the cords out to leave a clear drainage path.