KitLog pro

Powered By Kitlog Pro v2.0

Tarans RV7 Project - VH-TJL
' style=
Date:  4-9-2015
Number of Hours:  4.00
Manual Reference:  7-7, OP-7
Brief Description:  SEALING AND RIVETING OB END RIB INTO TANK

-INSTALLED IB CAPACITIVE FUEL PLATE
-TRIAL FITTED VENT LINE, BENT IB END AS REQUIRED & CHOPPED OB END TO FIT CORRECTLY
-FABRICATED PLATE TO COVER TOOLING HOLE ON END OF OB RIB
-SEALED & RIVETED TOOLING HOLE COVER ONTO RIB & T410
*FOUND THAT RIVETING THE 410 ONTO THE RIB BOWED THE RIB MAKING IT VERY DIFFICULT TO RIVET INTO PLACE
-SEALED VENT LINE INTO CLIP WITH FUEL TANK SEALANT
-CLECOED OB END RIB INTO PLACE WITH EXTREME DIFFICULTY
-RIVETED OB END RIB INTO PLACE AND CLEANED UP
MADE A HUGE MESS BUT HOPEFULLY IT'LL SEAL OK

PICTURES- 1607-1616
RIVETS - INST 53 - REM 0
WING RIVETS - INST 568 - REM 25
TOTAL PROJECT RIVETS - INST 2889 - REM 78
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.