KitLog pro

Powered By Kitlog Pro v2.0

Tarans RV7 Project - VH-TJL
' style=
Date:  7-14-2011
Number of Hours:  0.80
Manual Reference:  HS/R.S ASSY / S6-8
Brief Description:  HORIZONTAL STABILISER - REAR SPAR ASSY

TODAY I RECEIVED MY NEW HS411BPP & HS411APP BRACKETS SO I CLECOED THEM TO THE AFT HS SPAR WITH THE VA146 BEARING SANDWICHED BETWEEN THEM & DRILLED FOUR OF THE HOLES THROUGH TO THE HS411APP AS ONLY THE HS411BPP IS PUNCHED WITH THE HOLES FOR THE HINGE BEARING
I THEN REMOVED THE ASSEMBLY & DRILLED THE REMAINING TWO HOLES
NEXT I DEBURRED THE PARTS AND PRIMED THE VA146 BEARING WITH TEMPO ZINC PHOSPHATE SELF ETCHING PRIMER.
' style=

Clamped Ready To Drill

Clamped Ready To Drill

' style=

Removed to Drill

Removed to Drill

' style=

Bearing Masked Ready To Prime

Bearing Masked Ready To Prime

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.