TODAY I SMOOTHED THE EDGES AND FACES OF THE HS609PP BARS. THERE WAS A BIT OF SCRATCHING IN ONE OF THEM, BUT I WAS ABLE TO SAND THEM OUT. NEXT I CLECOED THE STIFFENER BARS TO THE SPAR CHANNEL AND FINAL DRILLED ALL THE HOLES. I THEN ENLARGED THE HS708 ATTACHMENT HOLES TO #21 SIZE THEN I CLECOED HS412/413 BRACKETS TO SPAR CHANNEL AND MATCH DRILLED THEM WITH A #30 DRILL. NEXT I MATCH DRILLED THE HS411APP THROUGH THE HS411BPP BUT I WASN'T HAPPY WITH THE ALIGNMENT OF THE HOLES SO I SCRAPPED THEM AND HAVE ORDERED NEW ONES FROM VAN'S.