KitLog pro

Powered By Kitlog Pro v2.0

Tarans RV7 Project - VH-TJL
' style=
Date:  6-22-2020
Number of Hours:  4.00
Manual Reference:  8-1
Brief Description:  ASSEMBLING/DRILLING FIREWALL

-AS I'M STUCK FOR THE TIME BEING WAITING FOR BITS I JUMPED TO THE FIREWALL AS I CAN WORK ON THIS IN MY FREE TIME AT WORK WITHOUT AFFECTING ANYTHING ELSE
-MOUNTED ALL STIFFENERS, SPACERS & GUSSETS TO THE FIREWALL AND DRILLED ASSY TOGETHER USING BOELUBE TO TRY AND KEEP MY DRILL BITS GOOD
-ALREADY FABRICATED F-601-P SPACERS SO MONTED AND DRILLED IN ASSY
**FORGOT TO GRAB MY ALUMINIUM ANGLE SO LEFT OUT THE F-601-E AND ITS HOLES TILL I CAN GET THAT BIT
-FILED & TIDIED UP F-601J & F601N EDGES TO FIT AS REQUIRED
-CLAMPED AND DRILLED F-601-J ASSYs TO FIREWALL
-DRILLED F-601TD BRAKE PLATE
**F-601TD BRAKE PLATE STILL REQUIRES CENTRE HOLES TO BE OPENED UP TO 7/16", I CANNOT FIND MY UNI BIT SO THIS CAN BE DONE LATER
-CLECOED & DRILLED FIREWALL RECESS TO FIREWALL ASSY (THE FIREWALL RECESS WAS A PAIN TO FIT DUE TO THE FLANGES NOT BEING EXACTLY RIGHT BUT AFTER A BIT OF WORK GOT TEM TO SIT FLUSH TO THE FIREWALL)
-FITTED AND DRILLED F-601Z FUEL PUMP DOUBLER TO FIREWALL
**DONT HAVE PLATENUTS SO THEY'LL BE DRILLED TO FIREWALL LATER
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.