KitLog pro

Powered By Kitlog Pro v2.0

Tarans RV7 Project - VH-TJL
' style=
Date:  5-19-2020
Number of Hours:  4.00
Manual Reference:  7-2, 7-4
Brief Description:  BACK TO WORK, DRILLING RWING LWR SKINS

FINALLY GOT TIME TO GET BACK INTO THE RV WITH BEING STOOD DOWN FROM WORK
-CLEANED UP THE WORK AREA
-LUBED UP ALL AIR TOOLS
-CLEANED THE DUST OFF THE WING
-TOOK A BIT TO FIGURE OUT WHERE I'M AT
-IT LOOKS LIKE LAST TIME I WORKED I FITTED THE LWR RIGHT WING SKINS AND MATCH DRILLED MOST HOLES
-MOVED CLECOS OVER AND FINISHED MATCH DRILLING LWR MAIN SKINS
-TAPPED TIE DOWN ASSY
-FITTED TIE DOWN ASSY/ AILERON BELLCRANK BRACKETS WITH ALL 8 BOLTS AND TORQUED
-MARKED TIEDOWN LINES
-REMOVED LWR SKINS

PICTURES- 9575-9581
RIVETS - INST 0 REM 0
WING RIVETS - INST 2547 REM 53
TOTAL PROJECT RIVETS - INST 4864 REM 105
' style=





' style=

TIEDOWN ASSY MOUNTED

TIEDOWN ASSY MOUNTED

' style=

LWR SKINS OFF

LWR SKINS OFF

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.