Began the vertical stabilizer tonight. It went together so quickly compared to the horizontal one. I was able to get the skeleton frame together and match drilled pretty quickly. I then threw on the skin (well struggled again but think I found and easier way to get the skin on) and was able to match drill the left side before I started getting tired. It really is amazing how much quicker this seems to be going than the previous.
Match drill and back drill the top six holes and only the bottom four shown