I had to take a few weeks away from the project. I sold my shop and moved everything to the airport. You dont realize how much you accumulate until you have to move it.
Today, to get back into the project, I just did miscellaneous airframe things until I get acclimated to working on the project full time again. I mounted the control stick, attached the front elevator control rod to the stick and to the elevator bellcrank. I also primed the aluminum tubes for the aileron control rods, and made a plexiglass firewall to bigin figureing out where the holes in the firewall are going to be.
I am at a point where there are a number of minor things to do to sort of bring the poject together. I am not sure where to start so I suspect that I will be jumping around a bit for a while.