Powered By Kitlog Pro v2.0
Patrick Kelley (Flion)
RV-10
Empennage
10-28-2009
< Previous Log Entry
Next Log Entry >
Date:
10-28-2009
Number of Hours:
3.50
Manual Reference:
9-6.8 to 9-7.3
Brief Description:
Finish assembly, begin match-drilling skins
Trimmed and clecoed trailing edge piece to right elevator and also clecoed and final-drilled the elevator horn. Match-drilled top and bottom skins to right elevator.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
434
1917
Avionics
77
368
Empennage
97
294
Engine
6
142
Fuselage
180
776
Interior
4
9
Miscellaneous
15
96
None
2
8
Paint
1
10
Systems
4
9
Wings
48
205
RV-6A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.