Brief Description: Prosealed second elevator, A/C fab
Finished the leading edge on the left elevator. Cut the ribs for the right elevator trailing edge and cleaned all the parts. Mixed two ounces of proseal and applied to foam ribs before inserting them in place. Applied proseal to the trailing edge wedge and clecoed it in place between the elevator skins. Placed elevator on a flat surface and placed wooden beam on trailing edge to weight it down while the proseal cures.
Not in build manual: located inlet/outlet vents for air conditioning on botttom of tail cone. Drilled and clecoed in place. Did not mark or cut skin because I could not remember which side was which and did not have the manual with me.