|
|
Patrick Kelley (Flion)
|
Date: 5-16-2012
|
Number of Hours: 2.50
|
Manual Reference: Section 30
|
Brief Description: Drill left step, install second A/C hose
|
|
At last the semester is over and the building can resume. I had needed to get some parts sent to me, which was holding some items up when I left off. One item was the fitting clamps for the smaller A/C hose, which the OEM sent to me. With those in hand, I fabricated the firewall connection and routed the hose to the tail cone.
Next I turned my attention to the left step. Phil Cobbin had machined some plugs for the step tubes and a drill guide. I installed the plug for the left tube, using a drill extension to set the depth, and then jigged the step in position using a level and a lot of clamps.With the step located and the jig in position, I used a long 3/16" bit to drill through the mount, tube, and plug. Then, having forgot my camera, I left off for the day (the photos were taken first thing in the next session).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |