Brief Description: finished disassembly, prepped the new skins
Finished drilling out the nose ribs, which was the last thing on the old skins. Prepped the new skins by dimpling all the exterior holes (except those for the fairing screws and tip fairing). Removed the plastic, clecoed in the nose ribs, and placed the new skins in the cradles. The old skins were put in the crate the new skins came in.