KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
' style=
Date:  5-31-2012
Number of Hours:  3.00
Manual Reference:  None
Brief Description:  Miscellaneous, including O2 fill

After removing the left baggage floor, I finished riveting the baggage ribs at the join bulkhead. Then I fabricated a mount for the O2 fill, creating a hat section that angles the fill and gauge toward the baggage door. The mount will be below the baggage floor and an access panel will be fabricated for service access. In the same area will go a 3-pin ground power connector. Phil Cobbin is currently cutting the mount for me and I'll show pictures when I can install it. The last task was to install the transponder antenna, now that the doubler is riveted in place. Today was a short day becaue I finished the annual on N156PK and took a test flight to Sedona for brunch.

Rivet count: 28 Total: 15575 - Plus 549 done at Van's
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.