KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
' style=
Date:  6-16-2010
Number of Hours:  1.50
Manual Reference:  None
Brief Description:  Assemble oxygen tank mount and bellcrank

Spent most of today repairing the -6A but these parts came back from powder coat and I just had to get them together. The bellcrank was straightforward to rivet together. I riveted all the nutplates to the oxygen tank mount and the inboard mounting rail. I can't rivet the other mounting rail yet because it has to be pop-riveted to the j-stringer on the floor and that can't be done until the side skins are riveted. Then the inboard rail can also be pop-riveted to the inboard j-stringer and the outboard mounting rail will be pop-riveted to the main plate. In the meantime, I attached the tank straps with AN4-4 bolts and trial fit everything into place, using clecos to hold the mounting rails to the j-stringers. Finally, I test fit the tank in the mount.

Rivet count: 38 Total: 4944
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.