Brief Description: Loom for control cables, oil filler door, cleanup
Fabricated and installed clamping loom for the control cables in the cockpit. Trimmed oil filler door and made opening in cowling. Installed hinge and trimmed the door further for proper operation. Finally, cleaned up shavings in cockpit area prior to doing brakes.