Brief Description: Elevator structures riveted. more..
Elevator structures were final riveted and set aside.
Rudder trailing edge was inspected as Pro Seal is cured. It is striaght and ready to try to rivet. Deciding whether or not to use the Van's method or grind a perfectly good flat die set to the angle of the rudder edge????
Ready to close the elevators other than the leading edge needs rolled. Aaron is going to pick up a length of 1/2" pipe to bend it.