KitLog pro

Powered By Kitlog Pro v2.0

Freds Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-16-1995
Number of Hours:  2.50
Manual Reference:  Fuselage CM P-xx
Brief Description:  Finished Out the Aft Bulkhead Bonding

Started at 10:30pm and Stopped at 1:00am

Added a micro fillet around the front side of the aft bulkhead and 1 layer of 2 inch tape.

Cut the rudder torque tube in half to correct the problem of the drilled holes being 90 degrees out of position. Rotated bottom of the tube 90 degrees and added a sleeve over the tube and bonded it with structural adhesive.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.