Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
Fuselage
11-6-1995
< Previous Log Entry
Next Log Entry >
Date:
11-6-1995
Number of Hours:
3.00
Manual Reference:
Fuselage CM P-xx
Brief Description:
Inspected and sanded the aft bulkhead.
Started at 8:30pm and Stopped at 11:30pm
Inspected and sanded the aft bulkhead.
Bonded two 1/2 by 1 1/2 inch 3 oz. glass on the front side of the aft bulkhead over the end of the trim spring attach pin.
Inspected and sanded the vertical stabilizer.
Bonded a 2 inch block of foam above the top hinge on the verticle stabilizer and filled a small hole on the bottom of the vertical stabilizer.
Strted the sanding of a 3/4 inch deep channel on the back of the Verticle stabilizer.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.