Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
Fuselage
10-28-1995
< Previous Log Entry
Next Log Entry >
Date:
10-28-1995
Number of Hours:
3.00
Manual Reference:
Fuselage CM P-xx
Brief Description:
Fuselage Preparation for Landing gear
Started at 11:00am and Stopped at 12:00 noon
Sanded bottom of fuselage where landing gear opening was.
Micro was added to exterior to level gear under panel edges on back edge.
Started at 10:00pm and Stopped at 12:00pm
Sanded back edge of gear under panel.
Wet out and placed one 2" wide glass tape on the fuselage where the gear under panel edges are.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.