Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
All
2-7-1996
< Previous Log Entry
Next Log Entry >
Date:
2-7-1996
Number of Hours:
2.00
Manual Reference:
Fuselage CM P-68
Brief Description:
Drilled a hole and sanded the Vertical Stabilizer
Drilled a 3/16" hole in the bottom of the Vertical Stabilizer and Rudder. Page 68 Step 11.
Sanded the Vertical Stabilizer to obtain a 1/16" gap with the Rudder. Page 68 Step 8
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.