Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
All
12-28-1995
< Previous Log Entry
Next Log Entry >
Date:
12-28-1995
Number of Hours:
5.00
Manual Reference:
Fuselage Cm P-86
Brief Description:
Bonded these strips with Structural adhesive to th
Started at 1:00pm and Stopped at 6:00pm
Sanded the canopy frame on inside for bonding.
Cut 42 3 oz. glass strips 8 inches long.
Bonded these strips with Structural adhesive to the inside of the canopy.
Steps 13, 15-16
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.