Brief Description: Completed steps 1-3 Right and Left Ailerons
Started at 11:00pm and Stopped at 1:00am
Completed steps 1-3 Right Aileron. Drilled out all rivets in left aileron and redid steps 1-3 for left aileron. Checked both ailerons for correct twist and found them to be correct.