KitLog pro

Powered By Kitlog Pro v2.0

Frank's Panther Cave
' style=
Date:  10-1-2008
Number of Hours:  49.00
Manual Reference:  
Brief Description:  Fuselage

October work done
Review swage fittings with LB International
Make proof test fitting for swage test
Make aluminium spar bushes * 10
Drill spar for 3/8" bushes - trial drill hinges - too hard from brazing - need to make new ones
Cut out 4130 plate for rudder cable brackets - ready to bend
Trial fit of mixture control cable
Fabricate rudder cable brackets
Fabricate seat belt brackets
Ream out 1/2" and 3/8" spar mounting holes and varnish
Drill hinges with carbide drill and drill out rudder and fin mounting holes to 5mm
Instrument panel - pick up aluminium water jet cut panel and trial fit instruments
Assemble elevator and hinges and check assembly - drill out holes 5mm
Check assembly and cut out for horn in fin. Make fuel tank straps jig
Control stick modifications - new centre section - drill out brass bushes from pivots
Machine brass bushes for control stick and aluminium bushes for spar
Check assembly - grind and drill new control stick bracket ready for welding
Brake cylinder brackets
Weld brackets and fit to rudder pedals - weld bracket to control stick
Cowl fasteners secure 4 fasteners on one side
' style=

Waterjet panel

Waterjet panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.