|
|
|
|
Daniels Web Site
|
Date: 9-5-2011
|
Number of Hours: 6.10
|
Manual Reference: 21-xx
|
Brief Description: Installed Fuselage Skin
|
|
Installed and riveted nutplates on bottom fuselage skin, including optional comm antenna. Installed and riveted bottom fuselage skin, including stiffeners and doublers (page 21-16, steps 2, and 4 through 7). Page 21-16 is complete
Made step attach angles and match drilled to F-1202F bulkhead (page 21-17, steps 1 through 10 except for step 9). Will seal the step openings with fuel tank sealant once I order some.
Match drilled nutplate brackets to F-1202F bulkhead and step angles and installed nutplates (page 21-18, steps 1 through 3).
Dimpled step floors and baggage bulkhead. Also, match drilled facet pump bracket and machine countersunk rivet attach holes (page 21-19, steps 1, 5, and 9).
Separated autopilot servo brackets and servo angles (page 39-03, steps 1 and 2). Page 39-03 is complete.
Finished deburring remaining parts for Section 21. Ready to prep and prime.
|
|
Nutplates on Bottom Skin
|
|
Bottom Skin Riveted
|
|
Remaining Sec 21 Parts Ready
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |