KitLog pro

Powered By Kitlog Pro v2.0

Daniels Web Site
' style=
Date:  10-22-2016
Number of Hours:  2.50
Manual Reference:  49-XX
Brief Description:  Finished Cooling System Installation

Page 49-14 & 49-21
Had very small gaps at front oval opening of bottom cowl so filled with Bondo. Sanded/refilled, as necessary for smooth blend. (step 10)
Filled cleco holes with flox epoxy mixture and ensured drain holes are still open. (step 11)
Copied and printed label on page 49-21, glued to cowl duct, and brush coated with epoxy resin. (step 12)
PAGE 49-14 & 49-21 ARE COMPLETE

Page 49-16
Received more heat shield from Van's. Used mis-cut bottom shield as a template and cut new bottom piece. Installed and rubbed into place. (step 4 - complete)
Sealed edges of heat shield with epoxy resin. (step 5)
PAGE 49-16 IS COMPLETE

Page 49-19
Cut SCAT hose to 11 inches. (step 1)
Installed SCAT hose to cooling shroud and secured with hose clamp. Will install and secure SCAT hose to bottom cowl opening next time cowling is installed.
PAGE 49-19 IS COMPLETE

SECTION 49 IS COMPLETE
' style=

Heat Shield

Heat Shield

' style=

Duct Label - Prior to Coat of Epoxy

Duct Label - Prior to Coat of Epoxy

' style=

Bottom Cowl Oval Opening

Bottom Cowl Oval Opening

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.