KitLog pro

Powered By Kitlog Pro v2.0

Daniels Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-23-2016
Number of Hours:  1.10
Manual Reference:  47-03
Brief Description:  Propeller On!

Heard back from Van's and they asked how bolts fit with everything installed. Then it hit me. DUH! I was so focused on the hardware that came with the propeller that I overlooked the S-1208 spacers that came in the Van's power plant kit in a separate bag.
With Denise's help, installed the S-1202 spinner plate and hub mount half and secured with flange bushings, bolts, Nordlock washers, and nuts. Step torqued bolts in a crisscross pattern to 120-175-235 inch-pounds. (step 6)

Attached propeller blades, hub clamp half, spinner bulkhead, S-1208 spacers (this time!), Nordlock washers, and bolts. Prior to torquing, set propeller pitch to #3 on Sensenich pitch tool. Step torqued bolts in a crisscross pattern to 120-175-235 inch pounds. (step 7)
' style=

Installed

Installed

' style=

Spacers Added This Time

Spacers Added This Time

' style=

Engine Flange Bolts

Engine Flange Bolts

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.