Page 46-14 Criimped spade connectors on oil pressure wires. Connected oil pressure sensor harness to oil pressure sensor and routed wires to spade connectors and connected them. Left tie-wraps loose for EGT harness. (steps 1 through 3 and step 5). Will accomplish oil pressure sensor setup when Skyview is powered up and system is being configured so considering step 4 to be complete as far as a build task is concerned. (step 4) Routed left and right CHT wires to sensor, crimped connector to wire and attached to sensor post. (steps 6 and 7) Routed oil temperature wire to sensor, crimped connector to wire and attached to sensor post. (step 8) PAGE 46-14 IS COMPLETE
Page 46-15 Routed regulator cable through cable penetration hole. Completed page 46-21 concurrently with this step so regulator cable was routed through modified grommet. (steps 1 and 2) Not a lot of excess regulator cable and could not tie off per the KAI so did the best with what I had. Don't know if harness is now shorter - we'll see when conneting the regulator. (step 3) Inserted wires into tach female connector then connected to tach wire. Tied off excess tach wires. (steps 4 and 5) PAGE 46-15 IS COMPLETE
Page 46-16 Connected power cable to starter power post and ground wire to starter lug. Added red RTV under ground cable where it passes over the oil tank bracket. (steps 1 and 2) PAGE 46-16 IS COMPLETE
Page 46-17 Fabricated manifold pressure hose and removed plug from nipple on compensating tube. Connected hose to manifold pressure sensor and compensating tube nipple. Tie-wrapped tube to sensor wires. (steps 1 through 3). PAGE 46-17 IS COMPLETE
Page 46-21 Modified grommet, routed regulator cable through the grommet and firewall cutout, and fitted grommet to opening. (steps 1 and 2) PAGE 46-21 IS COMPLETE