Brief Description: Installed Wings & Repositioned Aircraft in Hanger
Moved aircraft outside and installed wings. During LH wing installation, connected AOA tubing. Turned aircraft around and moved into the hanger, nose first, in preparation for engine installation. As usual, my sweety was a big help.