Steps 1 and 2 not applicable - items not installed yet.
Step 2 - Have not installed the WH-00020 Skyview harness yet so started to disassembly backshell on EMS connector to add wire between pin 12 to EFIS connector pin 27. Wire was already installed so this step is not applicable - done as part of harness build.
Step 3 - Installed wire into FUSELAGE connector pin 8.
Step 4 - Routed wire from FUSELAGE connector to the right side of the wire conduit at the center section.
Step 5 - NA
Step 6 - Routed wire through snap bushing in roll bar attach plate. Also routed eyeball cockpit light wires as well.
Step 7 - Routed wires through wire tube, then installed wires and wire tube up through roll bar until three wires (one for canopy latch switch and 2 wires for eyeball light) exited the hole at the upper end of roll bar. Installed modified snap bushing (flanges sanded to fit between roll bar halves) over wire ends and secured into roll bar.