Dad started the Elevator while I finished the HS this morning. He used the band saw to separate the sixteen ribs followed by drilling them with a #30. Each was identified as a set once drilled for later assembly.
Dad then started step 4 to create the counterbalance ribs, assembling them for later drilling.