KitLog pro

Powered By Kitlog Pro v2.0

ETHAN'S WEB SITE
' style=
Date:  11-24-2013
Number of Hours:  10.00
Manual Reference:  10-19 &10-20
Brief Description:  Assembly

Tracy and kids were out of town for Thanksgiving so I took advantage of the extra time. Spent all day today working on assembly.

Completed assembly of all frames and bulkheads, steps 3-8 on page 10-19

Assembled, with cleco's, the bottom and side skins with the now assembled frames/bulkheads. Installed the various longerons and started riveting. Completed four (two per side) of the long longerons. Happy with the results with no drilling out. Used a gauge to set the pressure on the gun and the results were very good. Prepped the next row of rivets with tape but decided to shut it down for the night.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.