KitLog pro

Powered By Kitlog Pro v2.0

ETHAN'S WEB SITE
' style=
Date:  10-20-2013
Number of Hours:  2.75
Manual Reference:  10-7 & 10-8
Brief Description:  Drilling and installing frames

Completed step 7 on page 10-7, drilling the stiffeners in the right skin.

Completed all steps on page 10-8. Installed and drilled the left skin and underlying stiffeners. Installed the F1012 bulkhead. Created and drilled the rudder stop skin stiffeners and rudder stop brace.

Completed steps 1-2 on page 10-9 match drilling the F1006 frame along with the baggage bulkhead.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.