Powered By Kitlog Pro v2.0
ETHAN'S WEB SITE
RV-10
All
10-6-2013
< Previous Log Entry
Next Log Entry >
Date:
10-6-2013
Number of Hours:
3.50
Manual Reference:
9-15
Brief Description:
Roll the leading edges
Rolled the leading edges of the elevators. Installed the blind rivets Completed steps 4-6 on page 9-15.
Also completed the installation and torque of the counterweights into the counterweight rib.
Started working on the piano hinge for the trim tabs to the elevators. Completed steps 1-3 on page 9-18
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
133
302
Elevator
30
64
Empennage
5
10
Horizontal Stailizer
14
47
Rudder
16
36
Shop
4
8
Tail Cone
44
100
Tools
3
3
Trim tabs
1
1
Vertical Stabilizer
16
33
Copyright © 2001-2024 Matronics. All Rights Reserved.