KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  5-11-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  PTT leads

Soldered the PTT's onto the leads through the sticks. Pushed the grips onto the sticks. Pushed the PTT's into place. Need to finalize the routing down the control triangle.
' style=

PTT's and grips in place.

PTT's and grips in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.