KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  5-9-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Wiring tasks

Installed the encoder, reworked the wiring placement around the encoder. Soldered on leads for the remaining 4 EIS connections. Started to run the EIS engine ground lead, took a break. Came back and drilled the lower forwards tail cone cross tie for a grommet. I had previously cut the extra length out of the ELT remote lead (looks like a regular telephone 4-wire cable). Soldered these back together and covered with heat shrink. Before re-running these wires, decided to clean out the airframe. Practically every tool is in there, plus a bunch of wire clippings, extra wire, tie wraps, masking tape, aluminum chips, etc. Vacuumed out the airframe for a while. Reran the aft portion of the intercom leads through the new grommeted opening. Ran the ground wires to the forest of tabs on the firewall. From top right to left: 2 com, 1 transponder, 1 Alt relay, 1 EIS, 2nd row: 2 power sockets, EIS light, OV detector.
' style=

End up with practically every tool in here.

End up with practically every tool in here.

' style=

More mess.

More mess.

' style=

Ground block.

Ground block.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.