KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  4-18-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  ELT mount

Finished off the drilling for the ELT support shelf and deburred it all. Looking at where it goes, decided the forwards portion might have some lightening holes added that could hold water bottles. Laid that out, cut the 3" holes, deburred these. Put the plastic edging material on them that I used for the inner wing ribs at the flap pushrod access area. Made up a bracket to support the bottom of the bottles and riveted that in place.
' style=

Bottle holder cutouts and ELT bracket.

Bottle holder cutouts and ELT bracket.

' style=

Under side - doubler plate and angle gussets.

Under side - doubler plate and angle gussets.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.