Continued drilling the bottom skin to the aft side panels. Clamped in some of the upper cross members to make the assembly stiff enough to be flipped upright for the squaring up of the assembly with the drilling of the upper and lower cross pieces.
Still inverted for bottom skin drilling. Cross beams clamped in to prevent sagging. (repeat photo)