Spent about 1 hour finishing the rib straightening. Spent about 1.5 hours on locating the forward ribs on the LH spar and started drilling these into position.
Fwd ribs in position on LH spar.
Drilled only 2 holes per rib.
From 9/23. Positioned spar this way to drill the other holes in the ribs.