Deburred the elevator pushrod supports. Started working out an elevator pushrod cover for in the baggage area. Found a piece of .032 channel 22" long in the scrap pile. This will work for the top. Cut out and formed up sides from .025. Made 4 pieces 11" long and 2 1/2" wide. Bent a 1/2" wide flange in them.