Drilled the forward rib gussets to the ribs, pilot hole size, about 1.5 hours. Measured the aft ribs for cutting and made the relief cuts, about 1 hour. 1 more hour drilling the aft rib gussets to the ribs. Started drilling the rib gussets to the final hole size.