~80% of the elevator work. This spans about a year and a half of time passed. I took a lot of time off, but did work here and there, extending the time it probably should have taken. I hope to finish the elevator by Thanksgiving and the rear fusalog before the wings and fuseloge arrives. Which I'm targeting for April 2019.
Skelatal structure of the left and right elevators
The inside of the trim tab about ready to receive the styrophone ribs