Brief Description: Nose gear bushing and console work
Spent some time with the kid today at the shop. Ran some control conduit after figuring out where it needed to go (a little trig involved). Trimmed up and temp installed the side consoles in the front and the rear to make sure everything would be hidden when completed. By everything, I mean the wiring and control runs.
Also epoxied in place the bushing for the NG-1 pivot. 5/8 tube inserted to make the bushings coaxial.
Aft side consoles in position - not installed permanently yet.
Showing side console detail and wire conduit in center.