KitLog pro

Powered By Kitlog Pro v2.0

Matt's Hangar
' style=
Date:  7-16-2015
Number of Hours:  4.50
Manual Reference:  Various
Brief Description:  Lots 'o Parts and odds 'n' ends

A summary of what happened...

- Cut out NGB parts from 1/4" glass sheet
- Cut out all plywood NGB parts
- Cut out NGB parts from 1/8" glass sheet
- Cut out foam NGB parts, but extend sides 3/4"
- Drill out 3/8 holes in LG box (cleanup)
- Glass FWD firewall stiffener side 1
- Glass inside LG box
- Install doubler on floor for landing brake
- Glass instrument panel to sides (I was slacking...)

Belly brake? Yea, I'm going to attempt one. It will be manual like an EZ, center console behind the throttles is where I'm thinking. Awkward yes, but that's the idea. More details on this later.

The foam nose gear box pcs are cut about 3/4" long. I won't actually put any of that together until, at the advice of an experienced builder, I have my nose gear here and operational with a new tire. Gotta get hunting that part!
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.