Powered By Kitlog Pro v2.0
Matt's Hangar
A-23 PROMETHEUS
Fuselage
4-26-2015
< Previous Log Entry
Next Log Entry >
Date:
4-26-2015
Number of Hours:
1.50
Manual Reference:
D-14
Brief Description:
FSB First Layup
Started on the FSB. Layed up the aft face first with BID. Put it under vacuum and heat.
Under the tent @ 140°F
After a 2 hour cure.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
A-23 PROMETHEUS Home
Category
# Logs
# Hours
All
282
1377
Control
24
117
Design and Research
1
3
Firewall Forward
1
78
Fuel System
1
37
Fuselage
88
555
Interior
1
4
Jigs and Templates
14
44
Landing Gear
31
138
Misc Aircraft
1
0
Miscellaneous
5
109
Shop
6
10
Tools
4
13
Vertical Stabilizer
22
77
Wings
83
192
GN-1 Home
ME-10 BASTION Home
A-21 INTREPID Home
PA-38 Home
ME-1XL SKIMMER Home
Copyright © 2001-2024 Matronics. All Rights Reserved.