KitLog pro

Powered By Kitlog Pro v2.0

Matt's Hangar
' style=
Date:  1-12-2016
Number of Hours:  2.00
Manual Reference:  D-41
Brief Description:  Finishing up NG-1

Got the rest of the parts completed that make up the NG-1 assembly and assembled them to make sure everything works right. I didn't have the steel tubing to make the linkage rod, but I used aluminum. I'll have to order a peice of steel to replace it with.

Make the cable a bit long, and then twist it to shorten it No more than 3 or 4 twists should be used in a cable this short - but that buys you about .050 length adjustment.
' style=

Assembly completed.

Assembly completed.

' style=

Tension cable completed.

Tension cable completed.

' style=

Assembly functioning

Assembly functioning

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.