Powered By Kitlog Pro v2.0
DARREN'S WEB SITE
RV8
Panel
11-10-2019
< Previous Log Entry
Next Log Entry >
Date:
11-10-2019
Number of Hours:
7.00
Manual Reference:
Brief Description:
wiring...
Moved the IBBS power leads to the main CB panel. installed most of the last section of the CB panel, started wiring the switches for lights and the flap,ap servo isolator swiches.
Ran teh final wires from the rear to the front, wired the GT-50.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
511
2532
Avionics
13
63
Empennage
54
277
Engine
44
190
Fuselage
225
1139
Miscellaneous
30
166
None
2
6
Panel
67
355
Undercarriage
29
104
Wings
47
232
Copyright © 2001-2024 Matronics. All Rights Reserved.