KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
' style=
Date:  10-2-2019
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Wired the main port side switch bank

Productive day... but long and slow.

Finally worked out how to get the rocker switches dimmable, and how to make the 'wire to ground' switches and 'short to shield' switches.
Made the looms from the CB panle to the port side switches, and spent a while tidying everything up.
The main switch box should be here in a couple of days, so the final wiring can then be done.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.